Project case study

Procuring a £1.4bn energy-from-waste PPP for six London boroughs

Technical leadership for a major PPP energy-from-waste facility with rail transport, from procurement strategy through to Financial Close and beyond.

Introduction

West London Waste Authority needed a long-term solution for the residual waste of its six boroughs. Following market engagement, the Authority and its advisers set up the procurement to allow a range of solutions, including use of existing infrastructure and development of new infrastructure. The result was a PPP for the Severnside Energy Recovery Centre in Avonmouth, with rail transport from two redeveloped transfer stations in West London. The contract is worth around £1.4bn, including around £300m of capital investment.

Nik was Lead Technical Adviser from the start, and continued to support the Authority after Financial Close. SUEZ won the contract and now operates the facility and transfer stations.

Project details

The Authority’s six boroughs each had their own priorities, so the procurement strategy had to bring them together. Work began with market engagement and discussions with local stakeholders, which shaped the strategy.

Nik prepared procurement and contract documents, supported the Authority throughout dialogue, evaluated bids, and supported it through the Preferred Bidder stage to Financial Close in 2013. He then supported the Authority during construction and mobilisation.

Recircle’s input

Nik was embedded in the project from the beginning as Lead Technical Adviser. The work included:

  • Market engagement, and working with stakeholders across the six boroughs
  • Developing a procurement strategy around the boroughs’ priorities
  • Preparing procurement and contract documents, including the specification, evaluation criteria and technical contract schedules
  • Resourcing the evaluation teams and managing budgets
  • Supporting the Authority throughout dialogue, and evaluating bids
  • Working with the Authority and its wider advisory team, including a Local Partnerships transactor, through the Preferred Bidder stage to Financial Close
  • Continued support during construction and mobilisation

Outcomes

Financial Close in 30 monthsfrom publishing the OJEU notice, with bank financing secured in 2013 for a highly complex contract
Six boroughs, one strategya procurement approach built around each borough’s priorities
Lasting relationshipsupport continued through construction and mobilisation
The facilities and rail transport

The project delivered the Severnside Energy Recovery Centre in Avonmouth, and the redevelopment of two rail-connected waste transfer stations in West London, at Victoria Road and Transport Avenue. Waste is transported by rail from West London to Avonmouth, reducing road haulage and providing environmental benefits. SUEZ won the contract and now operates all three sites.